Asphalt plant is crucial for road construction, blending asphalt with minerals to create mixtures meeting specifications. This process involves several steps, including initial screening, drying, heating, metering, and mixing. It can ensure that the asphalt mixture produced is of excellent quality and performance. Knowing how an asphalt plant works is key to good road quality and efficient construction. Let’s explore how asphalt plant works together!
Then Cold aggregate handling and screening process is a very important step in asphalt concrete production, which directly affects the quality and uniformity of the final mix. The following are the detailed steps of the process and the fist step about the question – how does an asphalt batch plant work.
Cold aggregates of different sizes (i.e. unheated gravel, sand, etc.) are loaded into an aggregate feeder using a loader. The aggregate feeder is responsible for the initial conveying of these cold aggregates to start the screening and processing process.
In the aggregate feeder, we should carry out the preliminary separation and grading work to ensure the efficiency of the subsequent treatment process.
The preliminarily processed aggregate is fed through the aggregate belt to the intermediate filtration screen. During this process, cold aggregates larger than a specific size (e.g. 40 mm or customized according to the customer’s requirements) are screened out, thus ensuring that only compliant aggregates continue to the next stage of processing.
The compliant cold aggregate is then conveyed to the drying drum via an inclined belt feeder. This step is part of the material transport process and the inclined belt feeder both lifts the aggregate to the required height and further advances the screening process.
In the drying drum, the aggregate is not only heated and dried but also cleaned by the flow of hot air, which removes dust and impurities from the aggregate surface. The dust and humidity generated during the drying process are drawn into the dust extraction system, where it is efficiently treated to comply with environmental standards.
It’s vital to monitor and regulate the quality and efficiency of each processing stage at the asphalt plant machine as it impacts the mix’s stability and quality later. By following these steps, only quality cold aggregates can enter the mixing process, ensuring high-quality asphalt concrete.
[/one_half_last]
Drying drum heating mixing is a core part of asphalt concrete preparation, the main purpose of which is to remove moisture from the cold aggregate and preheat it to create conditions for the subsequent mixing and blending process. The basic principles and process of this step are described in detail below.
The drying drum is a rotating cylinder in which the aggregate is heated by high-temperature gases generated by a burner. The burner is usually fueled by diesel, natural gas, or heavy fuel oil, and the heat generated is used to heat the aggregate directly through a heat exchange process within the drum. The rotation of the drum allows the aggregate to be uniformly heated as it moves, and at the same time enables continuous mixing of the aggregate.
Here is the heating and mixing process of the asphalt mixing plant in the following.
The whole drying drum heating and mixing process not only ensures the drying and preheating of the aggregates but also realizes the uniform heating and high-efficiency treatment of the aggregates through continuous rotation and hot air flow, which lays a good foundation for the production of high-quality asphalt concrete. It also lays the foundation for the lifting and screening of the hot aggregate in the next step.
The lifting and sieving of hot aggregates is a key stage in the asphalt concrete production process, following the heating and mixing step of the drying drum. The main purpose of this stage is to grade and store the heated and dried hot aggregate for subsequent accurate proportioning and mixing. This process is described in more detail below.
Elevator Principle: Hot aggregates are usually elevated using a bucket elevator. This type of lifting equipment picks up the aggregate through a series of ‘buckets’ fixed to a conveyor belt or chain, which move upwards in response to the movement of the belt or chain, ultimately conveying the aggregate to a specified height.
Operating procedure: The hot aggregate from the drying drum is first fed into the bucket elevator. The closed conveying effectively prevents heat dissipation and the entry of impurities during the lifting process.
Screening principle: Screening is usually carried out using a vibrating screen. The vibrating screen uses the vibration force caused by the electric motor to classify the aggregate on the screen surface according to size. Larger aggregates cannot pass through the screen holes, while smaller aggregates fall to the next layer or pass directly through the screen holes.
Graded storage: Workers allocate the screened aggregates to different silos for storage according to their size. Each silo stores aggregates within a specific size range, allowing workers to proportion them accurately according to the design requirements while preparing concrete.
In conclusion, lifting and screening hot aggregates in asphalt production directly impact final product quality and production efficiency. By rationally designing and optimizing the process, the asphalt batching plant’s performance and competitiveness can greatly improve. Next is the measurement and proportioning of aggregate, mineral powder, and asphalt.
In the process of asphalt concrete production, the accurate measurement and proportioning of aggregate, mineral powder, and asphalt is the key to making high-quality asphalt concrete. A sophisticated control system can achieve this process to ensure that each batch of concrete meets the design requirements. The following are the basic steps and principles of this process.
The control system sets the ratio of aggregate, mineral powder, and asphalt according to the design requirements. Modern asphalt batch mixing plant usually adopts a computer control system, which can automatically complete a series of processes such as measuring, proportioning, and mixing. The operator only needs to input the recipe parameters on the control panel, and the system can be automatic.
Workers measure all the materials and then convey them to the mixer for mixing. They add aggregate first, followed by mineral powder, and finally asphalt. The mixing time varies according to the circumstances, but it is important to ensure that the mixture is homogeneous. Special additives or processes in warm mix asphalt lower asphalt temperature for eco-friendly, energy-efficient laying processes.
Accurate measurement and proportioning is essential to ensure the performance of asphalt concrete. Incorrect proportioning not only affects the service life and safety of the road but can also lead to wasted resources and an additional burden on the environment. Accurate metering and efficient proportioning processes can significantly improve productivity and shorten construction periods while reducing costs.
In conclusion, accurate measurement and proportioning of aggregate, mineral powder, and asphalt is the core link in asphalt concrete production. It directly determines the quality and performance of concrete. Modern technology and strict management can effectively ensure the accuracy and efficiency of this process. What’s more, if you meet some debugs in your normal operation, you can see the common problems and solutions of asphalt mixing plant.
Mixing and finished product processing are two important links in the asphalt concrete production process, which directly affect the quality and performance of the final product. We will introduce the two links in detail.
Firstly, add the aggregate, mineral powder, and asphalt successively to the mixer according to the set ratio. Then start mixing and adjust the mixing time according to the different types of asphalt concrete. Continuously monitor the mixing condition to ensure the homogeneity and quality of the mixture.
Mixing and finished product handling are critical steps to ensure the quality of asphalt concrete. By mixing well and treating the product right, concrete quality improves and road lifespan extends effectively. Therefore, strict management and control of these two links is very necessary in the whole production process. For more videos, please visit YouTube.
| Model | ALQ40 | ALQ60 | ALQ80 | ALQ100 | ALQ120 | ALQ160 | ALQ200 | ALQ240 | ALQ320 |
|---|---|---|---|---|---|---|---|---|---|
| Capacity | 40 t/h | 60 t/h | 80 t/h | 100 t/h | 120 t/h | 160 t/h | 200 t/h | 240 t/h | 320 t/h |
| Cold Aggregate Hoppers | 4×4.5m³ | 4×6.5m³ | 4×7.5m³ | 4×7.5m³ | 5×7.5m³ | 5×12m³ | 5×12m³ | 5×12m³ | 6×15m³ |
| Dryer Size | φ1.2m×5.2m | φ1.5m×6m | φ1.5m×6.7m | φ1.65m×7m | φ1.8m×8m | φ2.2m×9m | φ2.6m×9m | φ2.6m×9.5m | φ2.8m×10.2m |
| Fuel consumption | 70-300kg / h | 100-400kg / h | 120-600kg / h | 150-1000kg / h | 150-1000kg / h | 150-1400kg / h | 180-1800kg / h | 180-1800kg / h | 260-2500kg / h |
| Vibrating Screen (Layer) | 4 layers | 4 layers | 4 layers | 4 layers | 5 layers | 5 layers | 5 layers | 5 layers | 6 layers |
| Mixer Capacity | 500kg | 800kg | 1000kg | 1250kg | 1500kg | 2000kg | 2500kg | 3000kg | 4000kg |
| Cycle Time | 45s | 45s | 45s | 45s | 45s | 45s | 45s | 45s | 45s |
| Filter Area | 230m² | 300m² | 420m² | 480m² | 550m² | 650m² | 700m² | 1050m² | 1350m² |
| Asphalt Temperature | 140-180 ℃ | 140-180 ℃ | 140-180 ℃ | 140-180 ℃ | 140-180 ℃ | 140-180 ℃ | 140-180 ℃ | 140-180 ℃ | 140-180 ℃ |
| Total Power | 170kw | 200kw | 300kw | 350kw | 380kw | 490kw | 550kw | 670kw | 865kw |
| Courts Models | ALT20 | ALT40 | ALT60 | ALT80 | ALT100 |
|---|---|---|---|---|---|
| Capacity | 20 t/h | 45 t/h | 60 t/h | 80 t/h | 100 t/h |
| The ability to | 40kw | 75kw | 120kw | 165kw | 200kw |
| Cold Aggregate Hoppers | 3.5m³×1 | 4m³×4 | 4m³×4 | 6.5m³×4 | 6.5m³×4 |
| Finished Product Hopper | 3t | 3t | 7t | 7t | 9t |
| Asphalt Temperature | 120-180 ℃ | ||||
| Fuel consumption | 13-15kg/t | ||||
| Asphalt Tank | 10 t | 20 t | 30 t | 30 t | 35 t |
| Control room | 2.2m | 2.2m | 3m | 3m | 3.5m |
| Option | Bag dust filter | ||||
| Model | ALYQ60 | ALYQ80 | ALYQ100 | ALYQ120 | ALYQ160 | |
|---|---|---|---|---|---|---|
| Capacity | t / h | 60 | 80 | 100 | 120 | 160 |
| Mixer capacity | kg | 800 | 1200 | 1300 | 1700 | 2200 |
| Mixing cycle | s | 45 | 45 | 45 | 45 | 45 |
| Total power | Gasoline(kW) | 54 | 63.5 | 104.5 | 125 | 157.5 |
| Coal(kW) | 75 | 86.5 | 127.5 | 169 | 205 | |
| filter area | m2 | 370 | 420 | 480 | 510 | 620 |
| Model | ALYJ10 | ALYJ15 | ALYJ20 | ALYJ30 | ALYJ40 | ALYJ60 | ALYJ80 | |
|---|---|---|---|---|---|---|---|---|
| Capacity | 10 t/h | 15 t/h | 20 t/h | 30 t/h | 40 t/h | 60 t/h | 80 t/h | |
| The ability to | Petrol | 48kw | 59kw | 68kw | 106kw | 132kw | 146kw | 186kw |
| Burning coal | 67kw | 78kw | 91kw | 129kw | 170kw | 192kw | 262kw | |
| Cold Aggregate Hoppers | 3m³×3 | 3m³×3 | 3m³×3 | 5m³×3 | 5m³×3 | 5m³×3 | 5m³×4 | |
| Finished Product Hopper | 2t | 5t | 5t | 9t | 9t | 9t | 20 t | |
| Asphalt Temperature | 120-180 ℃ | |||||||
| Fuel consumption | Petrol | 5-7.5kg/t | ||||||
| Burning coal | 13-15kg/t | |||||||
| Option | Water dust filter, Bag dust filter, Control room, Asphalt heat tank, Mineral flour tank | |||||||
How do asphalt plants work? Up to now, we all know about it in detail. An asphalt batching plant’s workflow is a precise, automated working process. Every step, from raw material prep to final product output, directly affects asphalt mixture quality and productivity. By optimizing each step, the asphalt mixing plant can greatly enhance performance, delivering top-quality materials for cost-effective road construction. All in all, you can know how asphalt plants work now!
By choosing our asphalt mixing plant, you get a set of efficient, high-quality, and environmentally friendly production equipment. Besides, you can also get a strong partner and get more knowledges such as what is the working principle of asphalt plant? We will try our best to help you win markets, attract customers, and grow your business. Contact us today to start your journey to success!